Vasai-Virar still flooded but gets back power after 37 hours

$ 13.99

4.6
(657)
In stock
Description

The 13 lakh residents of the fast-developing Vasai-Virar belt, whose road links with Mumbai were snapped on Monday and rail links on Tuesday, stayed
The 13 lakh residents of the fast-developing Vasai-Virar belt, whose road links with Mumbai were snapped on Monday and rail links on Tuesday, stayed

Mumbai Rains: How rapidly developing Vasai could vanish very soon

Mumbai monsoon: Over 200 mm rainfall cripples life in Vasai and Virar

Vasai Power Cut News Latest News on Vasai Power Cut - Times of India

Maharashtra: Life thrown out of gear in Vasai-Virar

Mumbai Rains: How rapidly developing Vasai could vanish very soon

Maharashtra Rains: Vasai receives heavy rainfall, Suncity Road flooded

DRP News Bulletin 12 August 2019: URGENT REVIEW OF FLOOD MANAGEMENT REQUIRED – SANDRP

Vasai: 70-year-old man sits in flooded water to protest against waterlogging in his ground-floor flat

Vasai-Virar still flooded but gets back power after 37 hours

Vasai Virar Problems: Latest News, Videos and Photos of Vasai Virar Problems

Mumbai rains: Homes flooded, Vasai-Virar locals shell out for hotels

Selling fast in Vasai-Virar: Home with plunge pool

Mumbai monsoon: Over 200 mm rainfall cripples life in Vasai and Virar

A day on, Vasai-Virar still marred by water-logging